The preventive maintenance inspection checklist is reviewed and a copy is sent with the invoice.
Whenever possible, authorized repairs are done at time of preventive maintenance inspection.
This preventive maintenance is billed on a per door basis. During the preventive maintenance, the replacement of small parts deemed necessary for optimal operation of equipment will be performed. If major repairs requiring extended hours to perform or major parts costs are needed, these will receive prior approval before being completed.
$149.00 for the first door
$49.00 each door thereafter
Note: Preventative maintenance cannot predict the life expectancy of springs and cannot predict the failure of motor operators. The inspection and PM can only optimize the functionality of the equipment at the point in time of performance. |